redirect pin user minus plus fax mobile-phone office-phone data envelope globe outlook retail close line-arrow-down solid-triangle-down facebook globe2 google hamburger line-arrow-left solid-triangle-left linkedin wechat play-btn line-arrow-right arrow-right solid-triangle-right search twitter line-arrow-up solid-triangle-up calendar globe-americas globe-apac globe-emea external-link music picture paper pictures play gallery download rss-feed vcard account-loading collection external-link2 internal-link share-link icon-close2

Knox Logistics Center II

753,230-square-foot industrial building directly off Interstate 215 in Riverside County

Project Details

Location

Riverside County, California

Product Type

753,230-square-foot speculative industrial

Timeline

Project Start:  4Q 2016
Project Completion:  1Q 2018 (substantial completion)

Overview


Trammell Crow Company and Clarion Partners recently completed construction at Knox Logistics Center II, which is a 753,230-square-foot speculative logistics building in Riverside County, California. Knox Logistics Center II is the second phase of Trammell Crow Company and Clarion Partners’ Knox Logistics Center, which is a 152-acre, master-planned e-commerce park located directly off Interstate 215 via Harley Knox Boulevard. Knox Logistics Center II was completed in first quarter 2018 and is available for immediate occupancy.




Opportunity


Knox Logistics Center II was specifically designed for e-commerce users, and the building includes 14,180 square feet of entitled mezzanine office, approximately 2,400 square feet of finished office space, 36-foot clear height, cross dock loading, 185-foot secured concrete truck courts, 130 trailer storage spaces, auto parking for 425 vehicles, 4,000-amp, 3-phase electrical service capacity, and ESFR fire protection.

For leasing inquiries, please visit:  http://properties.cbre.us/knoxlogisticscenter2

Contact

Tom Bak
Tom Bak
Business Unit Leader / Senior Managing Director
+1 (949) 477-4702
Neal Holdridge
Neal Holdridge
Principal
+1 (949) 477-4719
David Drake
David Drake
Executive Vice President
+1 (949) 477-4731
Thomas Dirks
Tommy Dirks
Senior Vice President
+1 (949) 477-4775

Explore Other Newport Beach Projects

Explore Other TCC Projects