redirect pin user minus plus fax mobile-phone office-phone data envelope globe outlook retail close line-arrow-down solid-triangle-down facebook globe2 google hamburger line-arrow-left solid-triangle-left linkedin wechat play-btn line-arrow-right arrow-right solid-triangle-right search twitter line-arrow-up solid-triangle-up calendar globe-americas globe-apac globe-emea external-link music picture paper pictures play gallery download rss-feed vcard account-loading collection external-link2 internal-link share-link icon-close2

Oregon Research Institute

80,011-square-foot office build-to-suit for Oregon Research Institute in Eugene, OR.

Project Details

Location

Eugene, OR

Product Type

80,011-square-foot office build to suit, LEED Silver certified for Oregon Research Institute in Eugene, OR

 

Timeline

Project Completion: November 2012

Overview


The Oregon Research Institute is a 501(c)(3) entity with a nationally recognized expertise in behavioral research. Its operations were housed in two different Class B and C buildings, were inadequate for its current needs and future growth, and were an impediment to recruiting top scientists. There were no suitable existing buildings in Eugene and ORI did not have the financial capability to construct new facilities. Its nonprofit status and thin balance sheet had hindered its ability to obtain a build to suit, resulting in false starts with two other developers on downtown sites.

Opportunity, Solutions & Outcomes


TCC partnered with the University of Oregon to offer a more economical building configuration on land within the University’s Riverfront Research Park. The land was leased from the University and a 15 year lease was provided for ORI. To accommodate ORI’s future expansion, the building was sized 15% larger than ORI’s initial need and the University and TCC found another tenant to occupy the expansion space for seven years. Because of ORI’s financial profile and a severe recession, TCC sought to presell the project. Lexington Realty Trust was engaged and committed up front to purchase the project at substantial completion. With that commitment, TCC arranged conventional construction financing with the Bank of Texas. TCC overcame significant opposition in the entitlement process and commenced construction in 2012. The project was delivered on time and under budget in November 2012.

Quick Facts

Architect

Soderstrom Architects

Contractor

Perlo Construction

Partner

Lexington Realty Trust

Contact

Steve Wells
Steve Wells
Business Unit Leader / Senior Managing Director
+1 (503) 946-4970
Steve Sieber
Steve Sieber
Principal
+1 (503) 946-4972
Louis Fontenot
Louis Fontenot
Vice President, Development Management
+1 (503) 946-4973