redirect pin user minus plus fax mobile-phone office-phone data envelope globe outlook retail close line-arrow-down solid-triangle-down facebook globe2 google hamburger line-arrow-left solid-triangle-left linkedin wechat play-btn line-arrow-right arrow-right solid-triangle-right search twitter line-arrow-up solid-triangle-up calendar globe-americas globe-apac globe-emea external-link music picture paper pictures play gallery download rss-feed vcard account-loading collection external-link2 internal-link share-link icon-close2
[email protected] in North San Jose, CA is a state-of-the-art advanced manufacturing project.

Project Details

Location

North San Jose, California

Product Type

The initial project will consist of three, Class A advanced manufacturing buildings, totaling approximately 600,000 square feet

Timeline

Project Start: December 2015
Project Completion: November 2016

Overview


[email protected] is a 3-building, 563,000-square-foot Class A advanced manufacturing project located at North 1st Street and Nortech Parkway at the top of Silicon Valley’s Golden Triangle. The project has prominent entry features, interiors to suit, 28-foot clear heights, significant power, ESFR sprinkler systems and is designed to achieve LEED® Silver certification.

Opportunity

The state-of-the-art advanced manufacturing project is visible to Highway 237 and minutes to both Moffett Park and Interstate 880. This central location facilitates easy access both to the San Francisco Peninsula and to the 880 Corridor leading to the Port of Oakland. 

Quick Facts

Architect

HPA

Contractor

Lusardi Construction

Partner

Principal Real Estate Investors

Contact

Will Parker
Will Parker
Principal
+1 (415) 948-1395

Explore Other Northern California Projects

Explore Other TCC Projects