redirect pin user minus plus fax mobile-phone office-phone data envelope globe outlook retail close line-arrow-down solid-triangle-down facebook globe2 google hamburger line-arrow-left solid-triangle-left linkedin wechat play-btn line-arrow-right arrow-right solid-triangle-right search twitter line-arrow-up solid-triangle-up calendar globe-americas globe-apac globe-emea external-link music picture paper pictures play gallery download rss-feed vcard account-loading collection external-link2 internal-link share-link icon-close2

1001 Office Towers

Build-to-Suit project of two Class A 15-story office towers in Bellevue, WA

Project Details

Location

Bellevue, Washington

Product Type

Two 15-story Class A office towers totaling 716,584-square-feet  

Timeline

Project Start: Q3 2019
Project Completion: December 2021

Overview


Trammell Crow Company and joint venture partner MetLife developed an Amazon Build-to-Suit office project comprised of two 15-story office towers in downtown Bellevue, WA. These Class A towers feature an efficient design that provides core-free planning areas with vision glass that spans from 1’-0” to 12’-0” above finish floor, with operable windows on ten-foot centers. 

1001 Office Towers modern amenities include ground floor retail, a significant outdoor public plaza, a fourth-floor private tenant terrace and multiple tenant balconies with Nana-Wall operable glazing providing unique indoor/outdoor spaces for the tenant’s use. Extensive bicycle storage and shower/locker rooms complete the abundant amenity package at the project.

1001 Office Towers is located in the core of the Bellevue CBD submarket across Lake Washington from Seattle. The project is immediately adjacent to the densest shopping, dining, entertainment hospitality and residential mixed-use projects in the region.

The site is just three blocks from Interstate 405, providing access North and South of Bellevue. Interstate 90 is accessible from both southbound surface streets and southbound I-405 provides commuters access to communities East and West of the downtown core.

The project was 100% pre-leased prior to construction. The building was delivered to USGBC Silver Shell & Core standards.
 

Quick Facts

Architect

LMN Architects

Contractor

Howard S. Wright

Partner

MetLife

Contact

Mike Nelson
Mike Nelson
Business Unit Leader / Managing Director
+1 (206) 708-6152
Kelley Kohout
Kelley Kohout
Senior Vice President
+1 (206) 694-5812
TCC_Head_SEA_CristineMcGeever
Cristine McGeever
Senior Development Manager
+1 206 694 5820

Download The Project Details

Explore Other Seattle Projects

Explore Other TCC Projects