redirect pin user minus plus fax mobile-phone office-phone data envelope globe outlook retail close line-arrow-down solid-triangle-down facebook globe2 google hamburger line-arrow-left solid-triangle-left linkedin wechat play-btn line-arrow-right arrow-right solid-triangle-right search twitter line-arrow-up solid-triangle-up calendar globe-americas globe-apac globe-emea external-link music picture paper pictures play gallery download rss-feed vcard account-loading collection external-link2 internal-link share-link icon-close2

PSE Kent BTS

Relocation of regional utility provider’s Operations Center.

Project Details

Location

Kent, Washington

Product Type

31,239-square-foot relocation of regional utility provider’s Operations Center. 

Timeline

Project Start: 2020
Project Completion: June 2021

Overview


In late 2019, Trammell Crow Company’s Seattle office was selected by Puget Sound Energy for the development of a new Kent Substation Operations Center. The Kent Substation Operations Center (KSOC) is an operations base supporting construction, maintenance, and repair of PSE’s electric and gas systems for its
customers. The new Kent Substation Operations Center replaced an outdated existing facility with a new 31,239 square foot building that includes assembly space, office, industrial operations and storage. The construction type is V-B fully sprinklered.

The Kent Substation Operations Center is a relocation of the existing KSOC from a site known as Shuffleton located approximately 8 miles north of the new location in Kent. The new build-to-suit development includes EV charging stations, fleet vehicle and equipment parking, seismically stable concrete pad storage for transformer equipment and several material containment bays. The site is secured with fencing and motorized gates with perimeter landscaping. The building layout is open and provides flexibility for future changing needs. Amenities include a library, fitness room with restrooms, showers and lockers. The new shop is designed to meet current environmental standards and the new building has modern highly efficient HVAC and other building systems designed to meet the stringent Washington state energy code.

The project was completed and delivered to the client in June 2021 on time and under budget.

Quick Facts

Architect

Nelson Architects

Contractor

Pennon Construction

Partner

Puget Sound Energy

Contact

Alex Garcia Mendoza
Alex Garcia Mendoza
Senior Associate
+1 (206) 694-5836