redirect pin user minus plus fax mobile-phone office-phone data envelope globe outlook retail close line-arrow-down solid-triangle-down facebook globe2 google hamburger line-arrow-left solid-triangle-left linkedin wechat play-btn line-arrow-right arrow-right solid-triangle-right search twitter line-arrow-up solid-triangle-up calendar globe-americas globe-apac globe-emea external-link music picture paper pictures play gallery download rss-feed vcard account-loading collection external-link2 internal-link share-link icon-close2

PSE Puyallup BTS

Redevelopment of Puget Sound’s largest utility provider’s Emergency Storm Center.

Project Details

Location

Puyallup, Washington

Product Type

33,660-square-foot redevelopment of Puget Sound’s largest utility provider’s Emergency Storm Center. 

Timeline

Project Start: 2020
Project Completion: May 2022 (projected)

Overview


  • The project consists of the complete redevelopment of PSE’s existing Puyallup Service Center. The project was redeveloped in phases to ensure PSE’s critical
    operations could continue uninterrupted during the entire duration of the project. The project also included the successful relocation and construction of a new, modern Emergency Storm Center fully equipped with cutting edge technology systems.
  • The redevelopment included construction of a two-story office building, a line production building attached to the two-story office building, and a detached vehicle maintenance building, along with site and right of way (ROW) improvements.
  • The two-story office building includes open offices, conference rooms, focus rooms, exercise room, multipurpose room, breakrooms, and emergency operations storm center.
  • The line production building includes workshops, storage rooms, warehouses, meter rooms, and a large loading dock with six bays and two dock levelers.
  • The vehicle maintenance building is strategically located in the middle of the operations yard, and includes a weather protected, covered area for vehicle
    maintenance and a large storage room for convenient access to needed parts and accessories.

Quick Facts

Architect

Zervas Architects

Contractor

Pennon Construction

Partner

Puget Sound Energy

Contact

Alex Garcia Mendoza
Alex Garcia Mendoza
Senior Development Manager
+1 (206) 694-5836
Craig Dobbs
Craig Dobbs
Managing Director
+1 (206) 708-6128

Download The Project Details

Explore Other Seattle Projects

Explore Other TCC Projects