50 Robert Milligan Parkway

A 323,750-square-foot industrial facility developed by a joint venture between TCC and Diamond Realty Investments.

50 rmp hero

Location

Merrimack, New Hampshire

Product Type

Industrial

Timeline

Project Completion: Q1 2024

Overview

50 Robert Milligan Parkway (50 RMP) is a 323,750-square-foot industrial facility developed by a joint venture between TCC and Diamond Realty Investments. The site located just over the business-friendly New Hampshire border, 50 minutes north of downtown Boston, with access to a diverse skilled labor pool. 50 RMP has been designed to accommodate uses ranging from logistics to advanced manufacturing, with 3 megawatts of power, 7” slab on grade, 53 dock positions, and 5 acres of excess parking. The building is move in ready with 3,444 square feet of speculative office space and subdivisible up to 75,000 square feet.
50 rmp - gallery 1
50 rmp - gallery 2
50 rmp - gallery 3
50 RMP - Gallery 4