Cotton Lane Commerce Park

Nearly one million square feet of industrial and logistics space.

Cotton Lane Hero

Location

Goodyear, Arizona

Product Type

Industrial

Timeline

Project Start: August 2023
Project Completion: October 2024

Overview

Cotton Lane Commerce Park, a two-phase project located in Goodyear, Arizona, includes two Class A industrial buildings totaling 542,873 square feet in addition to a 30-acre rail-served development site. This project broke ground in Fall of 2023 and was delivered in the Fall 2024.

Located at the southwest corner of Cotton Lane and Elwood Street, Phase I included two rear-loaded buildings. Building A spans 279,961 square feet and Building C spans 262,912 square feet. Features of the temperature-controlled buildings include 36’ clear height, dedicated trailer parking, secured truck courts, up to 6,000-amps of power to each building, signalized access, office suites, and LED warehouse lighting. The buildings are divisible to accommodate users as small as 50,000 square feet.

Phase II is a rail-capable 30-acre site served by Union Pacific. The site was fully improved alongside Phase I construction and positioned for a build-to-suit or strategic land sale.

CottonLane_0000_Cotton-Lane-Exterior---08
CottonLane_0001_Cotton-Lane-Exterior---07
CottonLane_0002_Cotton-Lane-Exterior---04
CottonLane_0003_Cotton-Lane-Exterior---02
CottonLane_0004_Cotton-Lane-Exterior---01
CottonLane_0005_Cotton-Lane-Aerial---03
CottonLane_0006_Cotton-Lane-Aerial---02
CottonLane_0007_Cotton-Lane-Aerial---01