Oaks Logistics Center
A 72.6-acre industrial project consisting of three, Class A buildings.

Location
Product Type
Timeline
Project Completion: Q4 2015
Overview
TCC and MEPT's project consists of three Class A industrial buildings, totaling approximately 1.3 million square feet. All buildings were constructed simultaneously and the project was completed in Q4 2015. The project has 32-to-36-foot clear heights, cross-dock configurations, ESFR sprinkler systems, and generous trailer parking.
Opportunity
The state-of-the-art project is accessible from major transportation corridors. The three-building development is located on Highway 84 just south of Highway 580 via the new Isabel Avenue/Highway 84 Interchange. The site has direct access to Interstate 580, proximity to the Port of Oakland, and is positioned to serve the entire Bay Area and Northern California.
Designed to achieve LEED® Silver certification, the construction of the project is estimated to create more than 420 green jobs for members of the Building Trades and over $157 million in economic activity.
Contact




