Park 8Ninety

A premier industrial business park consisting of 127 acres.

Exterior photograph of the Park 8Ninety building.

Location

Missouri City, Texas

Product Type

Industrial

Timeline

Project Start: September 2014
Project Completion: Q4 2021

Overview

TCC and Artis REIT partnered to acquire three tracts of land totaling 129 acres to develop a premier industrial business park located in Missouri City, Texas. The site previously sat undeveloped due to its low elevation. Through a partnership with Missouri City, TCC was able to raise the entire site by 2-3’ and move all stormwater detention offsite by digging a large pond in an adjacent city park.

The multi-phase project includes more than 1.7M square feet of industrial space. The first phase of Park 8Ninety, which was delivered in July 2016, includes 439,916 square feet; Phase II was delivered in September 2019, includes 576,407 square feet. Phases III and IV were completed in 2019 and 2020 as build-to-suits for a total of 132,991 square feet. Finally, phase V includes 676,860 square feet and delivered in late 2021.

The master-planned business park is located in the heart of Houston’s Southwest Industrial Submarket and offers more than 1,500 feet of frontage on Beltway 8 and over 2,000 feet of frontage on US 90A, allowing for multiple ingress/egress options to/from the park and exposure to more than 140,000 cars daily.
Exterior photograph of the Park 8Ninety building.
Exterior photograph of the Park 8Ninety dock doors.
Exterior photograph of the Park 8Ninety building.
Exterior photograph of the Park 8Ninety building and signage.
Exterior photograph of the Park 8Ninety building.
Image of the Houston, Texas skyline.

Explore Houston Projects